april 2012 | by susan jurasz | show project
After several months of fabrication, we are finally in North Dakota to install exhibits in the old Midland Continental Railroad train depot. Every day brings on a new layer of complexity and intrigue to the design. Even though we have all been working on the project, no single person, other than our art director, Peter, really has a concept of how all the pieces will fit together. And it seems there are thousands of pieces to consider.
We start with empty rooms. Exhibits get unloaded. They get unwrapped from miles of bubblewrap and foam. The pieces are sorted by room and by type. Hardware is counted and organized. Tools appear and disappear, handed from one person to the next, and a rhythm of teamwork develops. Everyone has a job and the work is steady. Every now and then, someone takes a break and walks through to see the progress, snapping a few photos to document the slow unfolding. At the end of the day, we close up shop, stiff and tired, but satisfied with the day's work. This is the most exhilarating work there is - to see a visitor center come alive after months of planning, design, and fabrication. A work of passion.